PROJECT OVERVIEW
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.
Planned and designed by
Ziad Raphael Nassar
Date
June 2024
Location
Seaside Hall, Lebanon
Transformation Time
10 days
BEFORE AND AFTER
Lorem ipsum dolor sit amet,Lorem ipsum dolor sit amet,Lorem ipsum dolor sit amet,Lorem ipsum dolor sit amet,Lorem ipsum dolor sit amet,
PLATFORMS
Building a large-scale wedding is much like solving a puzzle. The platforms cover the entire space, and the prefabrication of each piece ensures greater efficiency. Every part is carefully cut using cnc machines, then meticulously prepared to fit perfectly into its designated spot, guaranteeing a seamless, high-end finish. This is why we prioritize planning ahead; to streamline the process and achieve the best possible result.
Bridal Entrance
To ensure perfect execution, the bridal entrance was modelled and a simulation was prepared alongside the execution drawings.
Spiral Staircase
The metal structure was expertly manipulated into a seamless spiral staircase. The structure was put together with great precision. This ensured seamless, uninterrupted and efficient assembling on site.
Spiral Staircase
The finishing phase is critical to the success of any event. It’s the stage where final touches are applied, and every detail is meticulously checked to ensure flawless execution. We focus on perfecting each aspect to meet our high standards and ensure everything is in place ahead of the deadline, delivering an impeccable result.
BRIDGE COLUMNS
Standing at a height of 4.3 M the columns executed for this bridal entrance had to be designed for efficient on - site assembly and easy transportation.
DOME
This custom bar’s dome was executed for a high-profile wedding. The structure is built from a reinforced wooden frame, expertly CUT and assembled to form a sleek sculptural shape.
The dome itself is then enveloped in square metallic sheets and mounted at 6M height above the wooden bar.
STRUCTURE
Over 300 square metal sheets were precut and assembled on to this large metal structure.
Each piece numbered and fixed in place . The shape of the wooden structure was intentionally designed to hold the sheet SIN place with minimal effort and maximum efficiency .
The result is a sophisticated bespoke centerpiece blending craftsmanship and contemporary design.
ON SITE
BAR
Constructing a reflective bar with high-end materials and finishes, each piece was meticulously designed and installed like a puzzle to minimize on-site time and waste.
LIGHTING FIXTURE
These custom spherical light fixtures were crafted using precision CNC cutting then painted by hand for a flawless finish. Each structure is adorned with 100 light bulbs, carefully arranged to cast a soft, atmospheric glow. With 120 structures suspended from the ceiling these pieces serve as the elements that TIE the design together .
Welcome Area & Buffet
A2Z oversaw the Production of the mirror walls in the welcome area, which stood at a height of SIX meters, and also managed the buffet area, from the carpeting to the reflective candle shelves.
On site
Here are some captivating shots from behind the scenes of this magnificent large-scale wedding. These images offer a glimpse into the meticulous preparation and attention to detail that went into creating a truly unforgettable event. From the hustle and bustle of the setup to the final touches that brought the vision to life, each photo captures the essence of the hard work and dedication of everyone involved. Witness the magic that happens behind the curtains to ensure that every moment is nothing short of perfection.